|
Four seperate modules are craned into place at the building site onto a concrete slab foundation. A home that is 90% completed arrives and is set into place on the same day. In approximately two weeks, the home will be ready for final inspection and client move-in.
Watch a video (Real Player) that explains Off-Site, modular construction. |